Projects

The Template for Regeneration

Once it works in Yakutat — in 155 inches of rain with no road in or out — it works anywhere on Spaceship Earth.

Projects

Building the Template for Planetary Regeneration

Once it works in Yakutat — in 155 inches of rain with no road in or out — it works anywhere on Spaceship Earth.

Situk ReGen Campus
90-Acre Manufacturing & Education Hub

Situk ReGen Campus

A $32.5M integrated campus on the south bank of the Situk River. Basalt fiber production (1,500 t/yr), F8 freeze dryer factory, Maker-Shed, Situk Institute, and ENG8 catalyzed-fusion R&D. Features the Situk River Bridge — an 80-120m single-span basalt composite structure protecting salmon spawning gravels.

$32.5M Build
~$9M/yr Revenue
100+ Jobs
5-7yr Payback
F8 OpenFreeze™
World's First Open-Source Freeze Dryer

F8 OpenFreeze™

Basalt composite chamber ($250 vs proprietary steel), ESP32-S3 controller, AGPLv3 firmware with Home Assistant integration. Voice-activated: "Hermes, start the salmon freeze-dry cycle." CC-BY-SA hardware design, replaces $2,800-$3,200 Harvest Right with open, repairable, sovereign alternative.

$1,740 BOM
200+ Units/yr
$160K R&D
CC-BY-SA
WISE HOME & WISE TOWN
World's First Open-Source Town

WISE HOME & WISE TOWN

8 integrated sub-systems per home: Sovereign AI & Voice (Hermes-4), Parallel Haven Mesh, 3.2kW solar + VAWT, rainwater cisterns, composting, pyrolysis, spirulina bioreactor, food preservation. 30-home Phase 1 saves $11,560/yr per household with 2-year payback.

$11,560/yr Saved
2yr Payback
30 Homes
$0.002/kWh Target
The River Remembers
30-Second Cinematic Hero Video

The River Remembers

A visual journey from ancient Tlingit world to regenerative future. Aurora over Yakutat, the Situk River, traditional formline art, digital twin overlay, regenerative campus — culminating in Raven returning with regenerative knowledge. "Honoring ancestors. Empowering future generations."

30 Seconds
13 Scenes
Ancient to Future
Cinematic 4K